2006 Work Session F Photos

Click on an image to display a larger view.

Mary Cardin welcomes the volunteers at the Monday morning safety meeting.
Work session F group photo.
LD Osborn and Don Huber upgrade the MW02 from 6 to 12 volts.
New alternator and electric fan installed in MW02.
Dale Johnson and Tim Bristow take apart drop bottom gon 724.
Roy Blizzard cuts a block for drop bottom gon 724.
Tony Kassin cuts notches in a block of wood for drop bottom gon 724.
Roy Blizzard, Tony Kassin, Dale Johnson and Tim Bristow fit the last door on drop bottom gon 724.
Don Juergenson, Ken Madison and Kevin Corwin paint the Los Pinos phone booth.
John Coles and crew erecting a telegraph pole.
The telegraph pole is upright and the ground is being tamped.
As part of the foundation work on the old Chama log bunkhouse, Jim McGee pulls a chain under the structure so that steel beams can be inserted to raise the building.
Using a winch to move a 12x12 30-foot beam under the Chama log bunkhouse.
Don Bayer and John Schwartz work on the interior partitions of caboose 05635.
Caboose 05635, with new windows on the main body.
Bill Barbour and John Berges bolt corners onto boxcar 3553.
Mike Wissler mounts facia on boxcar 3553.
Erecting lights at the north end of the enginehouse.
New lights erected outside the enginehouse..