2009 Work Session M1/M2

Previous Home Next
August 28, 2009. By the time we left on Friday, the box cars had been moved off their trucks onto pier blocks and ties, most of the rotten siding had been replaced, the openings for doors on the north side had been covered with siding, all the installed siding had been painted, and good doors installed on the south sides of the cars. Photo by John Cole.
Previous Home Next