2006 Work Session A

Previous Home Next
Chris Trunk (left) holds up the end of the rebar as Marty Gonzales puts the bend on it. Hundreds of feet of rebar with dozens of bends was needed for the three outside areas to be concreted at the CRF. Photo by M&M.